Silvertown, London
Project type
Stabilisation and Remediation
Date
August 2019
Location
London
Portway undertook a large project that required both water and soil treatment due to hydrocarbons. The site was located around 100m from the Thames which meant we had to design are remediation method statement around this.
As well as remediating the site, Portway also removed all obstructions up to three meters, which we crushed and screened ready for re-use on site. All material that was excavated was stabilised with cement and placed at the clients desired levels.